We are exceptionally proud of the previous projects we have been a part of, in many instances delivering onsite engineering services to assist with the completion of a major project.
Whether it is our involvement in making improvements to Tower Bridge in London, or assisting an Antarctic Research Team upgrade their state-of-the-art research station with hydraulic legs, we have plenty of case studies for you to delve into, providing examples of the scale of projects Flowtech has been helping to complete.
Take a look through our case studies and if you have any questions about possible applications of our engineering services in your own project, don’t hesitate to get in touch with our sales team today.
Torr Works Quarry
Flowtech were initially contacted by Aggregate Industries to investigate a hydraulic fault on a hydraulic power pack for a stone crusher at Torr Works Quarry in Somerset.
University Fuel System
Our team were contacted by the University of Bath to help them with the design of a new fuel system, which would ultimately assist with research into propulsion systems.
Data Centre - South Wales
The ask for our installation team was to supply and install 5km of Brugg DN100 secondary contained Secon-X pipe into a Data Centre in South Wales, with a challenging and complex pipe route.
Rothera Research Station
Supporting our customer BAS at the Rothera Research Station in the Antarctic, Flowtech were asked to assist with the installation of a fuel pipe system.